Case study · Airport terminal · NSW, Australia

Shellharbour Airport runs its plant about 9 hours a day, down from 17.

A regional airport terminal ran its HVAC on a fixed schedule for every possible flight. Brightspace now runs it on the people actually in the building.

Owner Shellharbour City CouncilLive since 1 February 2026Scope Three passenger zonesBMS Innotech, over BACnet
Shellharbour Airport terminal building at dusk
40.1%

lower electricity cost, A$12,624 saved over eight months (ex GST)

30.7%

less grid electricity, 31,129 kWh

32%

lower emissions, 21.2 t CO₂-e

<12months

payback on hardware and installation cost

The story

What changed at Shellharbour.

The challenge

A schedule for every possible flight

The plant ran from 4 am to 9 pm every day, about 17 hours, whether a flight was due or not. The passenger zones fill in the hour before a departure and around an arrival, and are mostly empty in between.

What we did

Control set by the people inside

Occupant Trackers and Environmental Monitors feed a live digital twin of the terminal. The twin tracks every zone each second. Every minute, the gateway works out how much fresh air each unit needs and whether it should run, and writes the result to the existing Building Management System (BMS). The plant stops 15 minutes after the last person leaves.

The result

About 9 hours a day, comfort unchanged

The cooling setpoint stayed at 21.5 °C, and CO₂ stayed at or below 800 ppm on 238 of 242 days. Every month of 2026 used less electricity than the same month of 2025.

Three outcomes

What it meant for the council.

01

Lower operating costs

40.1% lower electricity cost, A$12,624 saved in eight months, and payback on hardware and installation in under 12 months.

02

Efficiency and ratings

30.7% less grid electricity and 32% lower emissions, with the evidence for the council's emissions reporting.

03

Better service

Passengers see no change in comfort, and staff no longer manage HVAC schedules.

The numbers

Grid electricity, month by month.

Every month of 2026 was lower than the same month of 2025, by 19.7% in March up to 38.8% in August.

Grid electricity by month, kWh
20252026, with Brightspace

Month by month

  • February12,387 kWh in 2025, 9,528 kWh in 2026: 23.1% less
  • March14,013 kWh in 2025, 11,258 kWh in 2026: 19.7% less
  • April11,044 kWh in 2025, 8,445 kWh in 2026: 23.5% less
  • May12,524 kWh in 2025, 8,784 kWh in 2026: 29.9% less
  • June13,424 kWh in 2025, 8,230 kWh in 2026: 38.7% less
  • July13,941 kWh in 2025, 9,228 kWh in 2026: 33.8% less
  • August13,241 kWh in 2025, 8,105 kWh in 2026: 38.8% less
  • September10,770 kWh in 2025, 6,637 kWh in 2026: 38.4% less

Totals: 101,344 kWh in 2025 and 70,215 kWh in 2026.

Grid electricity for the whole site, February to September 2026 against the same months of 2025.

Next case studyInternational Convention Centre Sydney

Get in touch

Find out what Brightspace could do for your building.

Start with a free savings assessment. We review your floor plans, plant and operating hours, and show you what you could save.