Results · October 2026
Shellharbour Airport cuts its electricity bill by 40%
In its first eight months with Brightspace, Shellharbour Airport's terminal cut its electricity cost by 40.1% and now runs its plant about 9 hours a day instead of 17.

Shellharbour City Council's regional airport terminal has cut its electricity cost by 40.1% in eight months, saving A$12,624 (ex GST), with Brightspace in control of the HVAC.
Before Brightspace, the plant ran from 4 am to 9 pm every day, whether a flight was due or not. The passenger zones fill in the hour before a departure and around an arrival, and are mostly empty in between.
Since 1 February 2026, Brightspace Occupant Trackers and Environmental Monitors have fed a live digital twin of the terminal's three passenger zones. Every minute, the gateway works out what each unit needs and writes it to the existing Innotech BMS. The plant stops 15 minutes after the last person leaves.
From February to September 2026, against the same months of 2025:
- 30.7% less grid electricity (31,129 kWh)
- 32% lower emissions (21.2 t CO₂-e)
- Plant running about 9 hours a day, down from 17
- Payback on hardware and installation cost in under 12 months
Comfort didn't change. The cooling setpoint stayed at 21.5 °C, and CO₂ stayed at or below 800 ppm on 238 of 242 days. Every month of 2026 used less electricity than the same month of 2025.
Get in touch
Find out what Brightspace could do for your building.
Start with a free savings assessment. We review your floor plans, plant and operating hours, and show you what you could save.